Local News

Traffic Shift for Southbound I-81 on George N. Wade Memorial Bridge Scheduled for Friday night

penndot

 

Weather permitting, a new traffic pattern for southbound I-81 will take place during the overnight hours on Friday, Jan. 19. The existing two lanes of southbound traffic across the southbound side of the George N. Wade Memorial Bridge will be shifted from the left to the right. This will allow space for the contractor to work on the left portion of the southbound side of the bridge. Construction barrels will separate the two areas at first, but the barrels will be replaced by concrete barrier over the next several days to separate the work zone from live traffic. There will be no changes to the existing southbound express lanes.

VIEW & ADD COMMENTS

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Advertisement

Advertisement